Nagargata Microtunnelling Project – PNCPL

Successfully completed 200 meters of challenging microtunnelling beneath the Gathyia River, supporting India’s major oil pipeline infrastructure with minimal environmental disruption.

01 Project Overview

Install a 1600 mm diameter pipeline crossing under the Gathyia River to support the Paradip–Numaligarh Crude Oil Pipeline (PNCPL), strengthening regional energy infrastructure as part of India’s “Hydrocarbon Vision 2030.”

02 Technology & Equipment

03 Scope of Work

Projects