01 Project Overview
02 Technology & Equipment
Advanced microtunnelling equipment designed to handle challenging geological conditions, including rock, sand, boulders, and mixed ground, with pipeline diameters up to 1,800 mm.
Adaptable to Mixed Ground Conditions
03 Scope of Work
Ground condition – Rock / Sand / Boulder / Mix.
Sri Lanka . 2012
Qatar . 2018
Oman . 2025
Iraq . 2025
India . 2025