Sri Lanka Tail Race Water Conveyance Project
Supported the Uma Oya hydropower project in Sri Lanka by supplying and maintaining TBM cutting tools, ensuring efficient hard rock tunnelling and reliable water conveyance.
01 Project Overview
Optimize water conveyance for the Uma Oya hydropower plant through tunnel enhancements.
Location: Bandara Vella, Sri Lanka
Year: 2012
Equipment: Double Shield Hard Rock TBM M-1685M (HK)
Category: Water Conveyance
02Technology & Equipment
Double Shield Hard Rock
TBM M-1685M (HK) – 4,200 mm
03Scope of Work
Procured and supplied cutting tools as a complete package for the TBM.
Supervised tool performance monitoring, maintenance, and spare parts procurement.
Collaborated with client Farab Co., contractor KTB, and consultant Mahab Ghods.
Projects
Sri Lanka . 2012
Sri Lanka Tail Race Water Conveyance Project
Qatar . 2018
Qatar Sewage Network Project
Oman . 2025
Oman (BAUSHER/ANSAB/SEEB) A Project
Iraq . 2025
Baghdad Sewage Project: Successful Installation of Auger Boring Machine